Dan Morrison | September 30, 2017


Video Treats // Demolition

The Model: Remodel Show — A Quick Take Down

 

This time on the Model remodel Show, Ben and the crew aim to take back some of the calendar that winter stole with a late March snow storm.

Over the winter, one way to save time and labor costs became clear: Forget about trying to save little pieces and parts and knock it down to the bare foundation.

They begin with the roof, newest sections first, then they pluck the walls and cut up the floor, using a small excavator for extra muscle.

"There's a couple of ways to take off roof systems, you can go inside and peel the ceiling out and sit underneath with 2x4s and sledgehammers and beat the sheathing off from underneath, but it's torture on the body.

We've found over the years that we can break the roof up into sections and pick them with the assistance of a machine. If you work smoothly and efficiently, you end up getting more accomplished in a day in a cleaner and safer manner that you would beating it apart by brute strength."

—Ben Bogie, Built to Last Design and Build

 

Comments

Compliments, I learned a few things. The system for removing a roof assembly makes a lot of sense. Good series, informative and well done. It's not fake, like the HGTV remodles. Looking froward to the rest. 

Add new comment

Filtered HTML

  • Web page addresses and e-mail addresses turn into links automatically.
  • Allowed HTML tags: <a> <em> <strong> <cite> <blockquote> <code> <ul> <ol> <li> <dl> <dt> <dd> <img>
  • Lines and paragraphs break automatically.

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
By submitting this form, you accept the Mollom privacy policy.