Stair Trim-Out (1) — Existing Conditions

So a guy calls and asks me to trim out a stairway that he and his buddy built.
May 12, 2015
Chris Whalen

This is the third part of a series of articles on Stair Trim-Out in a remodel of a 100-year-old cabin built using vertical logs. The project was started by the homeowner and his friend, a carpenter, about four years ago. They replaced the main-floor framing and the second-floor framing, removed some walls, furred out others, and left some of the original walls exposed, as you can see below.

(That is the electrician in the photo, not the owner, his buddy, or me.)

Apparently, the project took too long, or the homeowner and carpenter grew tired of each other, and I was called in to finish the job.

The usual suspects: cost, speed, and quality

In general, they did a great job preparing the project for the finished carpentry work. But it's not just the existing carpentry that I look at when taking over someone else's project.

My three areas of concern are the money, the schedule, and the expectations.

There are two parts to the money issue. First, do the customers actually pay and pay on time? Second, are they willing to spend what I think it's going to take to complete the project? In this case, both answers were "Yes."

After working on the project for four years, the clients wanted to see it come to an end, but they understood that the finish-work is not the place to hurry things along, so the schedule I laid out was fine.

Their expectations were high but not unrealistic.

We would be a good match.

Scope: Windows, doors, stairs, and more

My primary job is to fabricate and install trim for the windows, doors, and stairs, but there are some specialty items, too.

Besides the casing, extension jambs, and baseboard, the trim package includes skirt boards, newel posts, and some beadboard in several locations.

I also need to fit and install the factory-built stair treads, risers, nosings, and flooring.

The railing will be metal, installed 'by others' after I am finished.

The specialty items consist of:

  • Trimming the transition between the drywall ceiling and the log walls
  • Remodeling some storage spaces
  • Adding a top to a bay window seat
  • Routing out the flooring to install flush-mounted floor registers
  • Hang three pocket doors and install two entry doors

But this series of articles is about trimming the stairs. I'll try to cover some of that other stuff in future posts.

Tricky parts to plan out

There are a couple of tricky parts to this particular stair trim-out; the first will be wrapping the 4x4 post that rises up through the middle of the stair assembly.

The post is not quite centered, and the wrap is to be mitered, so that's tricky. It'll take a bunch of clamps, glue, and biscuits.

Another tricky part will be installing the nosings and flooring on the winder section of the staircase. This section has six triangular-shaped treads that are stacked on each other and connect the upper and lower straight flights.

It will be stain-grade work, but budget-conscious

For the most part, this will be stain-grade work, but there is some pre-primed 1x4 tongue-and-groove beadboard that will be painted by the homeowners.

I'll use vertical grain Douglas fir for the casing, base, newel posts, and miscellaneous trim pieces. Doug fir is relatively abundant here in the west; it looks great and is relatively affordable compared to other stain-grade species.

The extension jambs and skirt boards will be 3/4-inch vertical grain fir plywood. The treads and risers are hickory to match the flooring.

The tile floor will be installed into the bare spots—installed after I finish trimming the stairs. The wall section with the cubby will be covered with beadboard, leaving a "nearly invisible" door into the crawlspace access (behind the plastic, you can see a ladder leading down into the crawlspace)

While the skirt board stock is at the painter's shop, I will build the box newels.